Staff Housing Project/ Al Quoz
Staff Housing Project/ Al Quoz
Due to the expansion and spread of the cooperative in different regions and this requires in terms of providing housing, and the desire of the cooperative to provide living spaces with high efficiency for employees and with better specifications than a traditional workers housing, in terms of lighting, ventilation, appropriate distribution of services and providing the largest number of services and means of entertainment for various employees, and from this standpoint, the work on the project has been started.
This project is located on a land area of 36,300 sq. ft. and there is a separate existing building on the same plot. The project consists of three floors (ground + first + second + roof) where car parking, bus stops, service areas and entrances are provided on the ground floor, rooms consist of the following services (food preparation area / 2 toilets / 2 wash basins / sitting areas / sleeping areas) with 51 rooms, each with capacity to accommodate 10 people and the total number of residents is 510 people. The construction cost of the project is AED 12,200,000. The project is currently in the stage of laying the foundation, as one of the contracting companies was assigned to implement the project with the design and implementation system. The project is expected to be completed at the end of the fourth quarter of 2022.
